Pipeline Safety Enhancement Plan (PSEP)
PSEP was established to promote the continued safety and integrity of natural gas transmission pipelines by replacing or hydro-testing over 200 miles of high-pressure gas pipeline and replacing and/or upgrading approximately 400 mainline gas valves. GIS Surveyors Inc. (GSi) was the main contractor for the San Diego region projects providing base mapping, utility